By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Media HydeMedia Hyde
  • Home
  • Politics
  • Education
  • Entertainment
  • Sports
  • Blogs
  • Business & Commerce
  • Others
    • Religious
    • Metropolitan
    • Climate and Weather
Font ResizerAa
Media HydeMedia Hyde
Font ResizerAa
  • Home
  • Politics
  • Education
  • Entertainment
  • Sports
  • Blogs
  • Business & Commerce
  • Others
    • Religious
    • Metropolitan
    • Climate and Weather
Follow US
© 2026 Media Hyde Network. All Rights Reserved.
Metropolitan

Sharjeel Memon Defends Red Line BRT Pace Amid Construction Hurdles

Last updated: May 3, 2026 4:24 pm
Misbah Jogyat
Share
Sharjeel Memon Defends Red Line BRT Pace Amid Construction Hurdles
Sharjeel Memon Defends Red Line BRT Pace Amid Construction Hurdles
SHARE

Karachi’s Red Line Bus Rapid Transit (BRT) project is a “very tough” undertaking, Sindh’s Senior Minister Sharjeel Inam Memon said Tuesday, pushing back against mounting criticism over the project’s sluggish progress. Memon dismissed claims of government-induced delays, pointing instead to the immense technical complexity of the 26-kilometer corridor.

The project, which aims to connect Model Colony to Numaish Chowrangi, has become a flashpoint for Karachi commuters frustrated by years of gridlock, dust, and stalled construction. “It is a complex project,” Memon told reporters, characterizing the work as a massive engineering challenge rather than a simple road widening.

He insisted the provincial government remains committed to the timeline, even as ground realities suggest otherwise for thousands of daily travelers. The Red Line is unique among Karachi’s transit plans. It relies on a biogas-powered fleet and involves extensive utility relocation—a process that has repeatedly snarled progress.

Beneath the surface, aging water and sewage lines require complete overhauls before the bus lanes can be finalized. These hidden infrastructure failures have often forced contractors to stop, wait, and redesign, adding months to the original schedule. Critics, however, argue that the “complexity” narrative is a convenient shield for administrative mismanagement.

Local business owners along the University Road corridor have seen foot traffic crater as construction barriers remain in place far longer than promised. For these stakeholders, the technical excuses offer little relief from the economic strain.

Memon’s defense comes at a time when the Sindh government is under pressure to show tangible results for the multi-billion rupee investment. With the project’s completion date having already shifted multiple times, the public’s patience is thinning.

The minister’s insistence that the government isn’t to blame for the delays might satisfy the record, but for Karachiites stuck in hours of traffic every day, the distinction between “technical complexity” and “administrative failure” is becoming increasingly irrelevant. The project remains a race against time—and, for now, the traffic isn’t winning.

Share This Article
Email Copy Link Print
Previous Article Iran Guards say US options are ‘impossible’ military operation or ‘bad deal Iran’s Revolutionary Guard frames US policy as choice between ‘impossible’ war or ‘bad deal’
Next Article Toxic Legacy : Lead Poisoning Crisis Grips Pakistan’s Children Toxic Legacy: Lead Poisoning Crisis Grips Pakistan’s Children
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Sponsored Ads

Stay Connected

FacebookLike
XFollow
InstagramFollow
YoutubeSubscribe
WhatsAppFollow
ThreadsFollow
Europe
What to Know About the Bomb Threats Disrupting Flights Across Europe
Breaking
November 6, 2026
Melania Trump
Melania Trump Calls for Lasting Ukraine Truce as She Hosts Russian and Ukrainian Officials
Breaking
November 6, 2026
KP police seek
KP Police Seek Additional Rs25 Billion for FY2026-27, Draft Sent to Prime Minister
Breaking
November 6, 2026
45-Foot Sperm Whale Spotted Near Karachi
45-Foot Sperm Whale Spotted Near Karachi: WWF
Breaking
November 6, 2026
Major Construction Ongoing Near Iran Missile Bases, Satellite Images Suggest
Breaking
November 6, 2026
Cricket World Cup
Australia Appoints Mike Hussey as Consultant for Ashes and Cricket World Cup
Blog
November 6, 2026

You Might Also Like

Metropolitan

Woman Killed, One Injured as Speeding Trailer Hits Motorcycle in Baldia Town

By
Hannan Kaimkhani
Metropolitan

Major Legislative Step Taken to Prevent Child Marriages in Islamabad

By
Hamza baig
Metropolitan

FIA Officer Killed as Dumper Runs Over Motorcycle in Karachi

By
Aiza Uddin
Metropolitan

Lack of Approved Master Plan Causing Chaos in Karachi: Saeed Ghani

By
Hannan Kaimkhani
Media Hyde Media Hyde Dark
Facebook Twitter Youtube Rss Medium

About US

Media Hyde Network: Your instant connection to breaking stories and live updates. Stay informed with our real-time coverage across politics, tech, entertainment, and more. Your reliable source for 24/7 News.

Top Categories
  • Headline
  • Politics
  • Entertainment
  • Education
  • Sports
  • Religious
  • Metropolitan
  • Climate and Weather
Usefull Links
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Cookies Policy
  • Advertising Policy
  • Terms & Conditions

© 2025 Media Hyde Network. All Rights Reserved.

Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?